Skip to content
Synapse Soft

Compliance matrix

Requirement, Axon control, evidence produced and customer responsibility. Who provides what is kept explicitly separate.

Axon is designed to support the requirements below. This table is not a certificate, an approval or legal advice; compliance is achieved together with validation of the system at your site and your procedures.

  • System validation

    21 CFR 11.10(a) · Annex 11 cl. 4

    Axon control
    Template and protocol execution module runs validation activities paperless.
    Evidence produced
    Signed protocol results, version history
    Customer responsibility
    Risk-based validation of your own Axon install (GAMP 5).
  • Authorized access

    21 CFR 11.10(d),(g) · Annex 11 cl. 12

    Axon control
    Role-based permissions, identity-provider integration, segregation-of-duties checks.
    Evidence produced
    User and role records, access events
    Customer responsibility
    User lifecycle and role-assignment procedures.
  • Audit trail

    21 CFR 11.10(e) · Annex 11 cl. 9

    Axon control
    Time-stamped, append-only records; SHA-256 chain; raw-payload visibility.
    Evidence produced
    Audit trail entries, chain verification output
    Customer responsibility
    Audit-trail review frequency and owner.
  • Signature manifestation

    21 CFR 11.50

    Axon control
    Name, date/time and signature meaning (author, reviewer, approver) are held in the signature record.
    Evidence produced
    Signature record and on-document manifestation
    Customer responsibility
    Defining signature meanings in procedures.
  • Signature and record linking

    21 CFR 11.70

    Axon control
    A signature is bound to its record by digest; altering a signed record breaks the chain.
    Evidence produced
    Record digest and chain verification
    Customer responsibility
    Revision procedure for changing signed records.
  • Identification and password controls

    21 CFR 11.100, 11.200, 11.300

    Axon control
    Identity re-authentication at signing; identity-provider policies.
    Evidence produced
    Re-authentication events
    Customer responsibility
    Password policy, identity management and training.
  • Change and configuration management

    Annex 11 cl. 10 · ICH Q10

    Axon control
    CCMS: impact assessment, QA decision, task lock, effectiveness verification.
    Evidence produced
    Change record, impact matrix, closure signature
    Customer responsibility
    Defining change-classification criteria.
  • Controlled documentation

    EU GMP Chapter 4 · 21 CFR 211.100

    Axon control
    DMS: version control, periodic review, read-and-sign tasks, controlled copies.
    Evidence produced
    Version history, training signatures
    Customer responsibility
    Document hierarchy and review intervals.
  • Deviations and CAPA

    21 CFR 211.192 · EU GMP Chapter 1

    Axon control
    CAPA: containment, root-cause analysis, VOE tracking.
    Evidence produced
    Deviation and CAPA records, VOE result
    Customer responsibility
    Root-cause methodology and decision authority.
  • Risk management

    ICH Q9(R1)

    Axon control
    RISK: FMEA/RPN scoring, CPP and CQA traceability.
    Evidence produced
    Risk assessment records
    Customer responsibility
    Risk acceptance criteria.
  • Qualification and validation

    EU GMP Annex 15

    Axon control
    VMS: IQ/OQ/PQ protocol execution, cleaning validation, statistical calculations.
    Evidence produced
    Signed protocols, calculation records
    Customer responsibility
    Validation master plan and acceptance criteria.
  • Data retention and continuity

    Annex 11 cl. 7, 16

    Axon control
    Backup and restore per deployment model; on-premise option.
    Evidence produced
    Installation and operations documents
    Customer responsibility
    Backup policy, retention periods, disaster-recovery plan.

What we do not claim

  • FDA approval, EMA approval or third-party certification
  • Automatic or absolute compliance
  • Unsubstantiated performance or savings figures

Let's map it to your own checklist.